Catálogo de publicaciones - libros

Compartir en
redes sociales


Título de Acceso Abierto

Sustainable Construction Engineering and Management

Resumen/Descripción – provisto por la editorial

No disponible.

Palabras clave – provistas por la editorial

building information modeling; project owner; attitude; behavior; technology acceptance model; BIM; information model; bridge; maintenance; management system; Public–private partnership (PPP); risk identification; risk relationship; triangular fuzzy number; ISM; MICMAC; data collection system; worker’s smartphone; concrete temperature monitoring; high-rise building construction; sustainable roles; LEED; contractors; Vietnam; bridge deterioration; prediction model; semi-Markov process; Weibull-distribution; condition rating; sustainable construction project management (SCPM); sustainable performance evaluation; set pair analysis; informatization; greenization; Guangzhou metro; China; time management; delay management; mitigation strategy; owner perspective; contractor perspective; power construction project; Tanzania; knowledge transfer; safety behavior; safety management; construction site; structural equation modeling (SEM); building information modeling (BIM); building performance assessment (BPA); key performance indicators (KPIs); facility management (FM); operation and maintenance (O& M); operating room (OR); defects liability period; risk matrix; residential buildings; loss distribution approach; decision tree; analytic hierarchy process; dynamic programming; sustainable investment; project participants’ behaviour; roof installation projects; modular construction; rework; integrated design process; dependency structure matrix (DSM); process optimization; sustainability; green building; delay sources; risk management; random forest-genetic algorithm; computer aid; construction project; bridge construction; risk analysis; loss assessment model; third-party damage; insurance; sensitivity analysis; uncertainty modelling; load action; resistance; limit states; stochastic simulation; failure probability; structural reliability; correlations; linguistic action indicators; last planner system; linguistic action perspective; resource-dependent activity relationship; scheduling; scheduling software; Microsoft Excel Visual Basic for Applications (MS Excel VBA); rework causes; SWARA method; time; project success; building projects; sustainable construction; value management; exploratory factor analysis; construction management; green building materials (GBMs); building industry; Sustainable Development Goals (SDGs); construction industry; MCDM; COPRAS method; real case study; enterprise competitiveness; organizational flexibility; organizational innovation; modernization of construction industry; structural equation modeling; natural language processing; construction data management; machine learning; thermal insulation; multi criteria analysis; SALSA; buildings; Renovation Wave; sustainable highway construction; sustainability indicators; triangular intuitionistic fuzzy; multi-criteria decision-making; entropy measure; risk attitudes; organizational learning; fly ash; geopolymer; environment; sustainable; construction; public private partnership; critical success factors; fuzzy synthetic evaluation; project governance; maintenance, repair, and rehabilitation (MR& R); inspection; optimization; infrastructure; decision making; life cycle assessment; materials; greenhouse; digital transformation; digital technology; strategy; change management; project assessment; sustainability criteria; construction projects; decision robustness; risk process; project management; IDEF0; risk system implementation; design; smart technologies; decision-making methods

Disponibilidad
Institución detectada Año de publicación Navegá Descargá Solicitá
No requiere Directory of Open access Books acceso abierto

Información

Tipo de recurso:

libros

ISBN electrónico

978-3-0365-2629-4

País de edición

Suiza