Catálogo de publicaciones - libros

Compartir en
redes sociales


Operations Research Proceedings 2006: Selected Papers of the Annual International Conference of the German Operations Research Society (GOR), Jointly Organized with the Austrian Society of Operations Research (ÖGOR) and the Swiss Society of Operation

Karl-Heinz Waldmann ; Ulrike M. Stocker (eds.)

Resumen/Descripción – provisto por la editorial

No disponible.

Palabras clave – provistas por la editorial

No disponibles.

Disponibilidad
Institución detectada Año de publicación Navegá Descargá Solicitá
No detectada 2007 SpringerLink

Información

Tipo de recurso:

libros

ISBN impreso

978-3-540-69994-1

ISBN electrónico

978-3-540-69995-8

Editor responsable

Springer Nature

País de edición

Reino Unido

Fecha de publicación

Información sobre derechos de publicación

© Springer-Verlag Berlin Heidelberg 2007

Cobertura temática

Tabla de contenidos

Online Dial-A-Ride Problem with Time Windows: An Exact Algorithm Using Status Vectors

Anke Fabri; Peter Recht

The Dial-A-Ride Problem (DARP) has often been used to organize transport of elderly and handicapped people, assuming that these people can book their transport in advance. But the DARP can also be used to organize usual passenger or goods transportation in real online scenarios with time window constraints. This paper presents an efficient exact algorithm with significantly reduced calculation times.

Palabras clave: Time Window; Short Path; Status Vector; Exact Algorithm; Reduce Calculation Time.

Part XV - Network Optimization, Graphs and Traffic | Pp. 445-450

Die Anwendung des Verlustverteilungsansatzes zur Quantifizierung operationeller Risiken

Frank Beekmann; Peter Stemper

Der vorliegende Beitrag zeigt die in der WestLB angestrebte Anwendung des Verlustverteilungsansatzes, der zur Quantifizierung operationeller Risiken nach der Basel II-Rahmenvereinbarung herangezogen werden kann. Der Verlustverteilungsansatz gehört zur Klasse der fortgeschrittenen Messverfahren für operationelle Risiken und stellt in dieser den in der Bankenlandschaft am weitesten verbreiteten Ansatz dar.

Part XVI - Operational and Credit Risk | Pp. 453-457

Betriebskennlinien-Management als Performancemessungs- und -planungskonzept bei komplexen Produktionsprozessen

Dirk Eichhorn; Alexander Schömig

Schwerpunkt des traditionellen Produktions-Controlling ist der Bereich der Kosten. In Abhängigkeit davon, welche Rolle Lieferfähigkeit und Liefertreue in der Branche spielen, werden output-bezogene Performance-Indikatoren eingeführt. Während damit im Allgemeinen nur Symptome diagnostiziert werden können, stellt sich die Frage nach den Gründen von Planabweichungen und Möglichkeiten zur Verbesserung der Lieferperformance. Um Produkte gemäß Kundenwunsch auszuliefern sind mit Sicherheit die Durchlaufzeit und deren Varianz von Interesse. Eine ex-post Messung dieser Größen ist hilfreich; wichtiger ist jedoch eine Verringerung der Werte. Daher ist es zweckdienlich, die logistische Leistung bereits innerhalb des Fertigungsablaufs zu messen, statt an dessen Ende. Somit sollte es leichter fallen, Abweichungen früher zu erkennen und rechtzeitig Gegenmaßnahmen zu ergreifen. Mit Hilfe geeigneter Daten ist möglich, nicht nur die Durchlaufzeit zu verstehen, sondern auch Durchsatz- und Kostenthemen zu erklären und diese für planerische Zwecke zu verwenden.

Part XVII - Production and Supply Chain Management | Pp. 461-466

Über verschiedene Ansätze zur Ermittlung von Betriebskennlinien — Eine Anwendungsstudie aus der Halbleiterindustrie

Alexander Schömig; Dirk Eichhorn; Georg Obermaier

Der Bedarf an Modellen zur realitätsnahen Abbildung von Fertigungsprozessen ist nach wie vor aktuell. Gerade für das Verständnis fundamentaler Zusammenhänge in der Produktion sind geeignete Modelle von unschätzbarerem Wert, denn logistische Prozesse sind in der Praxis oft schwer nachzuvollziehen, so dass für die Beschreibung des Verhaltens bestehender Systeme flexible und transparente Methoden gefordert werden, die mit einem vertretbaren Ermittlungsaufwand einher gehen. Kaum ein anderer Industriezweig als die Halbleiterbranche ist durch die verschärften Rahmenbedingungen eines überaus komplexen, kapital- und zeitintensiven Produktionsprozesses gekennzeichnet. Eingebettet in einem wechselhaften Umfeld nimmt die Prämisse des wirtschaftlichen Produzierens einen zentralen Stellenwert ein, so dass nicht nur marktseitige Forderungen mit den betriebsseitigen Bedingungen in Einklang gebracht werden müssen, sondern vor allem auch ein Konsens zwischen den betrieblichen Anforderungen gefunden werden muss. Die typischen Charakteristika der Mikrochipfertigung hinsichtlich Fertigungslogistik, Materialfluss in einem Fertigungsverbund und die Herausforderungen bei der Modellierung von Arbeitsschritten zur Lösung verschiedener planerischer und operationeller Probleme werden in [9] ausführlich dargestellt.

Part XVII - Production and Supply Chain Management | Pp. 467-472

The Use of Chance Constrained Programming for Disassemble-to-Order Problems with Stochastic Yields

Ian M. Langella; Rainer Kleber

Stochastic yields from disassembly complicate the planning of so-called disassemble to order problems, where a specified amount of components must be harvested from various models of returned products. Chance constraint programming, a branch of stochastic programming, has proven useful in several applications of operations management. This contribution will first formulate a novel chance constrained programming model for the single-period disassemble-to-order problem. We will then illustrate its application using an example, and highlight the tradeoff between service and costs which emerges. We also suggest a variety of extensions to the basic model, many of which will likely prove to be trivial and relevant to industry.

Palabras clave: Stochastic Programming; Chance Constraint; Chance Constrain Program; Closed Loop Supply Chain; Closed Loop Supply.

Part XVII - Production and Supply Chain Management | Pp. 473-478

Optimal Usage of Flexibility Instruments in Automotive Plants

Gazi Askar; Jürgen Zimmermann

Scope of this work is the development of an optimization approach to find the optimal configuration of automotive plant capacities for a time horizon of one to seven years regarding market demand, planning premises, and dependencies between the shops (body shop, paint shop, final assembly) and between planning periods (e.g. learning curves). The methodology has been implemented in a planning tool and includes production and workforce planning. The optimization algorithm is based on a dynamic programming approach.

Palabras clave: Labor Demand; Planning Task; Dynamic Programming Approach; Optimal Usage; Workforce Planning.

Part XVII - Production and Supply Chain Management | Pp. 479-484

Comparison of Stochastic- and Guaranteed-Service Approaches to Safety Stock Optimization in Supply Chains

Steffen Klosterhalfen; Stefan Minner

Contributions to multi-echelon safety stock optimization can be classified as being either of the stochastic- or guaranteed-service framework. Though both approaches have been used in inventory theory for a long time, there is still a lack of a detailed comparison. In this paper, such a comparison is presented. Differences in the materials flow are outlined and insights into the performance of both approaches are gained from a simulation study.

Palabras clave: Supply Chain; Service Time; Service Level; Cost Advantage; Demand Uncertainty.

Part XVII - Production and Supply Chain Management | Pp. 485-490

A Stochastic Lot-Sizing and Scheduling Model

Sven Grothklags; Ulf Lorenz; Jan Wesemann

In the academic world, as well as in Industry, there is a wide unity that companies with a combination of high customer-value products and good logistics are especially successful in competition. Good logistics are marked by low production- and inventory costs as well as by a high ability to deliver timely.

Part XVII - Production and Supply Chain Management | Pp. 491-496

A Disassemble-to-Order Heuristic for Use with Constrained Disassembly Capacities

Tobias Schulz

Due to the increasing environmental awareness of their customers, manufacturing firms have to incorporate an ecological aspect in their corporate identity to remain competitive. In several cases these firms offer an option for their customers to return the product to them after its end-of-use or alternatively its end-of-life. The field of reverse logistics presents an overall approach on how these backward flows of products can be handled efficiently. Therefore, it expands the original focus of logistics to a closed-loop supply chain perspective.

Palabras clave: Planning Horizon; Heuristic Approach; Current Period; Reverse Logistics; Heuristic Solution.

Part XVII - Production and Supply Chain Management | Pp. 497-502

Supply Chain Management and Advanced Planning in the Process Industries

Norbert Trautmann; Cord-Ulrich Fündeling

Advanced Planning Systems decompose Supply Chain Management into long-term, mid-term, and short-term planning tasks. In this paper, we outline these tasks and reference application-oriented state-of-the-art solution approaches with regard to the process industries.

Palabras clave: Supply Chain Management; Process Industry; Production Mode; Advance Planning; Supply Chain Optimization.

Part XVII - Production and Supply Chain Management | Pp. 503-508